Parts of the decomissioned North West Hutton Oil Rig is towed on the barge H627. The Tug that towed it down to the River Tees was the Carlo Mango, Tugs based on the River Tees help with bringing the barge into dock. The recycling of the rig structure is to be dismantled at Able UK's Graythorpe Yard, Hartlepool. 30th June 2008.

 

 

BuiltWithNOF

[Home] [About] [Galleries] [July- Sept 2010] [H'Pool Tall Ships] [Airshows 2010] [April- June 2010] [Jan-March 2010] [Oct- Dec 2009] [Aug- Sept 2009] [June- July 2009] [May 2009] [Jan- April 2009] [Sept- Dec 2008] [Buzzard] [Fireworks] [Able UK] [Links] [Contact]

© Jonathan Hare 2005-2010. All rights reserved.